Featured Projects


Your combined knowledge, skill, integrity and good will made us… glad to be associated with you and with the final product. We all have a win- win project because of the professionalism displayed by Golden Triangle Construction. Humor, along with GTC’s pragmatic and architecturally sensitive solutions to problems that inevitably arise… saved the day more than once.
— – Gordon E. Lewis, Lewis Himes Associates, Inc.
 

Intersand america


Location
: Windsor, Colorado

Description: A new +/- 42,000SF light manufacturing facility with connected process tower section. There will also be +/- 3,000SF office space. Site consists of 6.53 acres and includes 50% of the access road, walks, parking areas, driveways, rails, pits and landscape areas.

ARCHITECT: Hauser Architects, P.C.

 
633 CTC - final.jpg

633 colorado tech center

Location: Louisville, Colorado

Description:Construction of a 153,018 sf single story tilt-up concrete warehouse building and associated site improvements.  GTC to provide access to owner and prospective tenants for tenant finish work.

 

 

ARCHITECT: MOA ARCHITECTURE

 

 

lONGBOW INDUSTRIAL

Location: Boulder, Colorado

Description:30,317 SF new construction project containing nine open workshop bays with matching office spaces and a tenth bay containing a two story office space.  Project is designed to exceed the energy efficiency requirements by at least 30%.  Other green building elements include high-efficiency lighting, evaporative cooling in workshops and high efficiency RTU’s in office spaces.  54 parking spaces, 17 compact spaces, 4 ADA spaces for a total of 75 parking spaces.  16 short term bike spaces, 11 long term bike spaces.

ARCHITECT: RAILTON MCEVOY ARCHITECTS

 

CENTERRA INDUSTRIAL BUILDING NO. 1

 

Location: Loveland, Colorado

Description:New 83,890 SF, single-story, tilt-up concrete panels flexible industrial, manufacturing and warehouse space with office space located in the front and loading docks located in the rear portion of the building.   

 

ARCHITECT: WARE MALCOMB 

 
700 Tech Ct. September 2018 Ground Exterior-23.jpg

LCC at ctc building a

Location: Louisville, Colorado

Description: New 136,00SF office warehouse in the Colorado Tech Center. 

 

ARCHITECT: Intergroup Architects

 

centerra industrial park - building 5

Location: Loveland, Colorado

Description: Construction of a new multi-tenant manufacturing / warehouse, single story, tilt-up concrete, core and shell building for a total of 122,807SF. The building will have an office area of 12,281SF and a warehouse area of 110,526SF. The project includes 170 parking stalls, six of which are accessible stalls; site improvements and is located on 7.081 acres.

ARCHITECT: Ware Malcomb

Centerra+4+-+final+3x5.jpg
 

South Fordham industrial building

Location: Longmont, Colorado

Description: Construction of a 97,498 sf one-story office/warehouse building and associated site work. Building is site cast tilt-up concrete wall panels, drilled piers built to shell conditions and steel framed roof. This building also includes 16 dock high doors and 4 drive ins. Site work includes earthwork and import for proposed grades and building pad, complete utilities including public utility crossing that will require pot-holing and care to maintain, landscape and retaining walls.

 

lEHMAN PRINTING CENTER

 

Location: Berthoud, Colorado

Description:New 62,812 SF 2-story printing center. Masonry and steel frame with split face CMU and vertical standing seam siding exterior finishes. Also included finishing of the interior. 

 

 ARCHITECTROBERT G. DASHIELL, JR. P.E. INC.

 
700 Tech Ct. September 2018 Ground Exterior-90.jpg

725 tech court - ctc building B

Location: Louisville, Colorado

Description: New Construction: 146,323 sf core and shell office/warehouse building.

ARCHITECT: Intergroup Architects

 
Centerra 1 - Taylor.jpg

centerra industrial park - building 6

Location: Loveland, Colorado

Description: New 1-story, 122,800 SF industrial building and all associated site work.  GTC has previously completed buildings 1, 2, 4 and 5 (there was no building 3, it was a parking lot).

ARCHITECT: Ware Malcomb

 
AIM-nw.jpg

AIM PROCESSING

Location: Longmont, Colorado

Description: Remodel of an existing 41,769 sf, 1-story industrial building. Mainly exterior work. Building was constructed with exterior CMU block and exterior concrete walls with steel stud interior walls, steel bar joists and ballasted membrane roofing over metal deck. Project includes the modification of the front and side exterior of the building (north and west side) to update appearance. 1,800 sf of warehouse space on the east side of the building to enlarge the existing warehouse space. A new covered patio area at the front (north) side of the building, a small storage building removed from the rear (south side) and new roof structure over existing equipment on the south side.

ARCHITECT: Adragna Architecture + Development