fORT LUPTON MIDDLE SCHOOL - ADDITION & RENOVATION 


 

Size: 121,834 SF

Completion:  AUGUST 2014

Delivery:  CM/GC

LEED:  GOLD DESIGNED, NOT CERTIFIED

 

121,834 SF interior phased renovation of a middle school and an addition.  A new geothermal system .  Adjacent portions of the existing building remained occupied throughout construction.  Although the project was designed to achieve the LEED Gold rating, the owner opted not to proceed with LEED certification.  

  • Sustainable Site: Storm water quality control, geothermal well field.
  • Water Efficiency: All new high efficiency plumbing fixtures were installed in the school.
  • Energy Efficiency: Added insulation at the roof and exterior walls, added lighting controls, new energy efficient windows, new LED light fixtures, water source heat pump and geothermal HVAC system, upgraded BAS controls..
  • Materials & Resources: 75% of materials were recycled.