fORT LUPTON MIDDLE SCHOOL - ADDITION & RENOVATION
Size: 121,834 SF
Completion: AUGUST 2014
Delivery: CM/GC
LEED: GOLD DESIGNED, NOT CERTIFIED
121,834 SF interior phased renovation of a middle school and an addition. A new geothermal system . Adjacent portions of the existing building remained occupied throughout construction. Although the project was designed to achieve the LEED Gold rating, the owner opted not to proceed with LEED certification.
- Sustainable Site: Storm water quality control, geothermal well field.
- Water Efficiency: All new high efficiency plumbing fixtures were installed in the school.
- Energy Efficiency: Added insulation at the roof and exterior walls, added lighting controls, new energy efficient windows, new LED light fixtures, water source heat pump and geothermal HVAC system, upgraded BAS controls..
- Materials & Resources: 75% of materials were recycled.